Building & renovation
Frequently asked questions.
A building project raises many questions. Here you will find clear answers to the topics that usually come up first.
Questions & answers
From first conversation to construction.
01 · The architect
Know who you will be working with.
01Which projects can Architect Basaran help with?
New construction, conversions, renovations, care dwellings, interior design and small-scale multi-unit housing. At our first meeting, we discuss whether your request fits the scale and support you need.
02Will I work directly with Mehmet Ali Basaran?
Yes. Architect Basaran is an independent practice. You discuss your project directly with Mehmet Ali Basaran and have one clear point of contact for the design, application documents and agreed supervision.
03What happens at the first meeting?
We discuss the location, your wishes, the existing situation, the required spaces, budget and timing. We can then clearly define the commission: what needs to be investigated and which services are required?
04Can I request advice or a feasibility study only?
Yes. A short feasibility study can be useful before buying a property or commissioning a full design. We agree in advance which questions, plans and checks are included.
05Can you review an existing plan or design?
Yes, as a separate advisory commission. Send the available plans, photographs and your specific question. I will review aspects such as layout, feasibility and points to consider for the next step.
06What should I bring to the first meeting?
Available plans, photographs, a cadastral or survey plan, information about the property or plot and an initial list of your wishes. A realistic budget range helps us start with a clear focus.
07Which area do you work in?
The practice is in Maasmechelen, Limburg. Projects elsewhere in Belgium can be discussed. Location, travel and the requested site supervision are taken into account in the quotation.
02 · Renovation and permits
The right step before you start building.
The Flemish permit rules and requirements to appoint an architect below were checked on .
08Do I need an architect for my renovation?
Work requiring a permit usually requires an architect, with statutory exceptions for certain limited interventions. Structural work inside a dwelling or on façades and roofs requires an architect for design and supervision, even if no permit is required. Have your specific work assessed and consult your municipality and the Flemish Environment Permit Portal.
09When do I need an environmental/building permit?
A permit may be needed for construction, extensions, demolition, changes of use or changes to the number of dwellings. Exemptions apply only if all conditions and local rules are met. Since 1 March 2026, an extension to a home, such as a veranda or attached garage, requires a permit: the former notification procedure for this work has been abolished. See the Official rules for extensions.
10Can you tell me in advance whether my plan is feasible?
I can make an initial assessment based on the plans, regulations and existing situation. A positive initial assessment is not a permit: the competent authority assesses the specific application.
11Can you regularise unauthorised building work?
I can investigate the existing situation, history and rules, then indicate which regularisation options may be examined. The competent authority ultimately decides on the application and may impose conditions; regularisation is never automatic.
12Do I need an architect for new windows, façade work or insulation?
Where no structural or stability changes are involved, exemptions from appointing an architect exist, for example for windows or façade cladding. Structural work does require an architect. Whether a permit is needed is a separate question: heritage, street boundaries and local rules can matter. Have the entire intervention assessed together.
13Does a dormer or roof extension always need a permit?
If a dormer or roof extension increases the building volume, a permit is required. Exemption from appointing an architect is a different matter: it may apply to a roof extension covering no more than a quarter of the roof area, provided it does not resolve a structural problem or alter stability. Have this assessed in advance using the Rules for roof work.
14How does a permit application proceed?
We prepare the plans and documents and submit the application. A normal permit process can take about 4 to 6 months; this is indicative. The completeness check takes up to 30 days. Once complete and admissible, the decision period is normally 105 or 120 days for the ordinary procedure, or 60 days for the simplified procedure. Additional documents, extensions or appeals may lengthen the process. Starting work must also take account of publication and the appeal period. Read the Explanation of procedural deadlines.
15Can a municipality have stricter rules?
Yes. In addition to Flemish rules, municipal regulations, subdivision conditions, spatial implementation plans or heritage rules may apply. An address and a clear description are therefore needed before drawing conclusions.
03 · Commission and construction
Clear agreements on the next steps.
16Which stages can you guide?
Depending on your needs, this can range from advice and design to permit documents, detailed construction plans, tendering and site supervision. The exact services are set out in the quotation and commission confirmation. Where an architect is legally required, the commission also includes supervision of construction. Another architect may take over that supervision under the professional rules; it cannot simply be omitted.
17How are fees determined?
Fees depend on the scope, complexity, requested services and duration of the support. You receive a quotation in advance detailing the included services and payment stages.
18Can you recommend a contractor or structural engineer?
If external partners are needed, we discuss the expertise the project requires. The selection and separate commissions of other building partners are clearly distinguished from the architectural commission.
19How long does a design take?
This varies by project and how quickly decisions are made. The building’s condition, the level of detail and any permit requirements also affect the schedule. We agree the next milestones once the commission is clear.
20What if I do not have a surveyor or plans yet?
That is not a problem. We identify the missing basic information and the surveys, photographs or technical studies needed to start correctly.